土地和路权服务

西班牙&E secures easements on private property for our electric and gas systems including any supporting equipment and facilities.  这些地役权提供可持续发展目标&E the rights to access and 维护 our existing facilities and construct new lines and facilities in compliance with legal, regulatory and industry standards to provide safe and reliable service throughout our service territory.  在西班牙&E, we take great care to keep our easements and rights-of-way clear of any structures, improvements or other uses that might interfere with our ability to provide safe and reliable service.

土地服务

侵占情况说明书

侵占情况说明书

了解更多 about easement encroachments and how you can work with 西班牙&E to ensure the success of your projects by viewing the 侵占情况说明书.

浏览便览

西班牙&E’s preference is that you consider options that do not encroach within or encumber 西班牙&物业、地役权或路权.  可持续发展目标允许的用途&E地役权 or rights-of-way are very limited in scope and type.  每个使用可持续发展目标的请求&地役权或通行权 will be reviewed on a case-by-case basis.  如果西班牙&E可以容纳你的项目, your request may also require approval by the California Public Utilities Commission.

Public Utilities Code Sections 851 - 857 requires 西班牙&E在处置西班牙之前寻求CPUC的批准&E财产或允许在可持续发展目标范围内侵犯&E地役权.  请参阅 Learn More options below for greater detail about CPUC Sections 851 - 857 which could add a 最少6至12个月 你的项目时间表. 点击 在这里 阅读CPUC代码的详细部分. 

In December 2019, the CPUC also adopted a Tribal Land Transfer Policy.  If the Tribal Land Transfer Policy applies to your project, this may add an 额外最少4个月 to a project’s timeline and may result in a tribe’s involvement in the process.  请参阅 部落土地转让政策 有关此政策的进一步详情. 

入侵的请求

申请在可持续发展目标范围内进行开发的许可&电力或燃气租赁.

了解更多

地役权放弃权利

申请退出可持续发展目标&E地役权

了解更多

常见问题

An easement or right-of-way is a right to use the property of another for certain purposes. 西班牙&E取得财产地役权, 归他人所有, 为正确安装, 维护, 操作和使用我们在该物业的设施.  The easement may restrict certain uses within the easement or right-of-way area, for the purpose of 维护ing unencumbered access to 西班牙&E设施, allowing us to 维护 safe and reliable systems.  An easement or right-of-way remains in effect and transfers with the property to any new owners.

一个西班牙&E utility corridor is a strip of land that forms a passageway through which 西班牙&E installs, operates and 维护s its gas and electric facilities both above and below ground. 一个西班牙&E utility corridor can either be located within land owned by 西班牙&E,或在另一个可持续发展目标所依赖的土地上&拥有地役权或通行权.

An encroachment occurs when a person builds on or intrudes on, 下, 或者超过另一个人的财产, 包括地役权范围内, without permission from the property or easement holder.

Property owners should refer to their property title report or title policy to determine the presence of any easements on their property.

Any item or activity that could interfere with the safe and reliable operation of 西班牙&E的设施被称为侵占, which is prohibited 下 the terms of the easement along with any prohibited encroachments by City, 状态, 和联邦政策. 西班牙&E actively enforces rights granted by our easements, 受到这些政府政策的保护, to ensure reliable operation of our electric and gas systems.

The Owner of the property has the responsibility to 维护 clearance of all encroachments from an 西班牙&E地役权, 其中包括清除植被, 垃圾, 或任何其他干扰可持续发展目标的材料&E设施. 西班牙&E的地役权给了我们这个权利, 但不是义务, 根据需要修剪树木和清除植被.  西班牙&E may choose to enforce its easement rights to require such clearing at the property owner’s expense.

西班牙&E has the right to use an easement or right-of-way for specific purposes including access to and from its gas and electric facilities for maintenance and construction. 西班牙&E may enforce these rights and rights granted through government policies, by requiring the encroachment be removed at the property owner’s expense.

在西班牙&E, we take great care to keep our facilities clear of anything that might cause a safety or reliability issue.  可持续发展目标内的用途&地役权或通行权 are usually very limited in scope and type.   任何类型的使用都需要获得可持续发展目标的书面同意&E along with ad在这里nce to all California Public Utilities Commission (CPUC) General Orders and OSHA standards. Certain encroachments may require approval from the CPUC.  如果您有西班牙中的现有项目编号&E 建筑服务 or Service Order Team, you can submit an 入侵的请求 对西班牙&E审查. 

If you have an easement maintenance concern, please email 西班牙&E .地政总署地址 (电子邮件保护).

联系信息

有关可持续发展目标的问题&地役权或通行权

电邮至地政总署 (电子邮件保护) 如果你对可持续发展目标有疑问&地役权或通行权. 

如有一般查询(与土地权利无关),请 联系西班牙&E客服1-800-411-7343

查询有关植被管理的资料

访问我们的 植被管理 页面.

电邮:植物管理 (电子邮件保护) 或致电(858)654-8608

挖之前先打811 

挖掘前请拨打811进行挖掘警报. DigAlert must be called at least 2 working days in advance of digging but no more than 14 days before digging is to start. If digging is not complete within 28 days of mark out, 然后必须调用DigAlert重新标记. Mark out must be redone every 28 days until excavation (digging) is completed.  为第一次标记提供免费标记.  西班牙&E will send a crew to mark the 下ground gas and electric facilities before you begin work, 帮你计划一个安全的项目.  有关DigAlert的详细信息,请访问 http://digalert.org/calaw-full